Projects per year
Search results
-
Finished
Study of open-channel flows partially covered with two heights of vegetatio,
Tang, X., g, S., Yang, K. & Cao, Z.
1/09/21 → 1/03/24
Project: Internal Research Project
-
Effect of Vegetation Patch on Compound Channel Flows
1/06/19 → 31/08/23
Project: Internal Research Project
-
Flow Assessment for the Floodplain with Transplanted Trees and Effects of Inundation on Modeled Land Characteristics
Papadikis, K., Rahimi, H., Singh , P. & Tang, X.
1/01/19 → 31/12/21
Project: Internal Research Project
-
Study on the flow structure of asymmetric compound channel
Tang, X., Papadikis, K., 史晓刚, Rahimi, H., 李路帆, 童中山, 王芳芳 & 刘圣凡
1/01/18 → 31/12/21
Project: Governmental Research Project
-
Impact of Mixed Layer Vegetation on Channel Flows
1/11/16 → 31/01/19
Project: Internal Research Project