TY - JOUR
T1 - Kashwani risk assessment
T2 - New approach for oil and construction industries
AU - Kashwani, Ghanim
AU - Liu, Engui
AU - Nawaz, Waleed
N1 - Publisher Copyright:
© 2018, GEOMATE International Society.
PY - 2018
Y1 - 2018
N2 - The aim of this study is to provide an integrated framework that can optimize the implementation of the safety engineering system through the usage of a risk assessment. Current safety studies in oil & gas and construction exposed the presently weak areas in the risk assessment application thereby aiding the selection of the framework inputs in this research. There are three main sections employed as filters during the hazard identification stage in which each one of them has specific criteria. Such a focus will facilitate avoiding the kind generalizations practiced in most risk assessment sessions to cover all the possible scenarios that can occur with the existing hazards. Each group has three standards that should clarify the identified hazard, its dimension and interaction mechanism with the wanted construction activity. Following this full examination, a regular risk assessment procedure is carried out where risk estimation and evaluation will be conducted. At the same time, risk monitoring will be involved in the all steps to facilitate a healthy communication between the parties, especially the management and end-users.
AB - The aim of this study is to provide an integrated framework that can optimize the implementation of the safety engineering system through the usage of a risk assessment. Current safety studies in oil & gas and construction exposed the presently weak areas in the risk assessment application thereby aiding the selection of the framework inputs in this research. There are three main sections employed as filters during the hazard identification stage in which each one of them has specific criteria. Such a focus will facilitate avoiding the kind generalizations practiced in most risk assessment sessions to cover all the possible scenarios that can occur with the existing hazards. Each group has three standards that should clarify the identified hazard, its dimension and interaction mechanism with the wanted construction activity. Following this full examination, a regular risk assessment procedure is carried out where risk estimation and evaluation will be conducted. At the same time, risk monitoring will be involved in the all steps to facilitate a healthy communication between the parties, especially the management and end-users.
KW - Construction
KW - Integrated framework
KW - Risk assessment
KW - Safety engineering
UR - http://www.scopus.com/inward/record.url?scp=85058439590&partnerID=8YFLogxK
U2 - 10.21660/2018.52.33934
DO - 10.21660/2018.52.33934
M3 - Article
AN - SCOPUS:85058439590
SN - 2186-2982
VL - 15
SP - 53
EP - 61
JO - International Journal of GEOMATE
JF - International Journal of GEOMATE
IS - 52
ER -