@inproceedings{61cd324ed2704737aa180ed0ec1027fb,
title = "Implementation of construction waste reduction strategies in Shenzhen",
abstract = "Rapid economic development and large scale construction in Shenzhen have produced large amount of construction wastes all around the city in the past two decades. However, the majority of the generated wastes have not been well processed, which has caused many environment problems. Therefore, implementation of construction waste management strategies in Shenzhen is in urgent need. This paper introduces the present state of construction waste in Shenzhen and investigates the effectiveness of the existing waste reduction measures. A questionnaire survey was conducted. The main focus of this paper is to describe the views of construction industry participators on the effectiveness of each existing waste reduction measure and challenges in implementing waste reduction strategies in Shenzhen.",
keywords = "Construction waste, Shenzhen, Waste reduction",
author = "Yuan Hongping and Jane, {Hao Jianli}",
note = "Publisher Copyright: {\textcopyright} 2008 Proceedings of CRIOCM 2008 International Research Symposium on Advancement of Construction Management and Real Estate. All rights reserved.; 2018 International Research Symposium on Advancement of Construction Management and Real Estate, CRIOCM 2008 ; Conference date: 31-10-2008 Through 03-11-2008",
year = "2008",
language = "English",
series = "Proceedings of CRIOCM 2008 International Research Symposium on Advancement of Construction Management and Real Estate",
publisher = "The Hong Kong Polytechnic University",
pages = "365--370",
editor = "Chang-Chun Feng and Ming-Xuan Yu and Zhen-Yu Zhao",
booktitle = "Proceedings of CRIOCM 2008 International Research Symposium on Advancement of Construction Management and Real Estate",
}