TY - JOUR
T1 - The integrated process planning and scheduling of flexible job-shop-type remanufacturing systems using improved artificial bee colony algorithm
AU - Zhang, Wenkang
AU - Zheng, Yufan
AU - Ahmad, Rafiq
N1 - Funding Information:
We express our gratitude and acknowledge the support of the China Scholarship Council (Grant No. 202006130018) and the NSERC Canada (Grant Nos. NSERC RGPIN-2017-04516 and NSERC ALLRP 545537-19) for funding this project.
Publisher Copyright:
© 2022, The Author(s), under exclusive licence to Springer Science+Business Media, LLC, part of Springer Nature.
PY - 2022/6/25
Y1 - 2022/6/25
N2 - This study considers an integrated process planning and scheduling (IPPS) problem for remanufacturing systems incorporating parallel disassembly workstations, a flexible job-shop-type reprocessing shop, and parallel reassembly workstations. This IPPS problem aims to determine the allocation/sequence of end-of-life products on the disassembly/reassembly shops and make decisions on the process path selection, operation sequencing, workstation allocation, and selection for reprocessing jobs. To solve the problem, a mixed-integer programming model is first built to characterize it mathematically, and a novel extended network graph is designed to represent and solve this problem visually. Then, an improved artificial bee colony algorithm is proposed that can solve the IPPS problem of remanufacturing systems with disassembly, reworking and reassembly shops simultaneously. In this introduced algorithm, a 3-level real-number solution representation scheme is adopted for encoding and decoding processes, and efficient neighborhood search structures are designed to improve the quality and diversity of the population. Computational experiments were systematically conducted on serval test instances. The results show that the proposed algorithm is highly advantageous for solving the IPPS problems in the remanufacturing systems by comparing it with four baseline algorithms.
AB - This study considers an integrated process planning and scheduling (IPPS) problem for remanufacturing systems incorporating parallel disassembly workstations, a flexible job-shop-type reprocessing shop, and parallel reassembly workstations. This IPPS problem aims to determine the allocation/sequence of end-of-life products on the disassembly/reassembly shops and make decisions on the process path selection, operation sequencing, workstation allocation, and selection for reprocessing jobs. To solve the problem, a mixed-integer programming model is first built to characterize it mathematically, and a novel extended network graph is designed to represent and solve this problem visually. Then, an improved artificial bee colony algorithm is proposed that can solve the IPPS problem of remanufacturing systems with disassembly, reworking and reassembly shops simultaneously. In this introduced algorithm, a 3-level real-number solution representation scheme is adopted for encoding and decoding processes, and efficient neighborhood search structures are designed to improve the quality and diversity of the population. Computational experiments were systematically conducted on serval test instances. The results show that the proposed algorithm is highly advantageous for solving the IPPS problems in the remanufacturing systems by comparing it with four baseline algorithms.
KW - Flexible scheduling
KW - IPPS
KW - Improved ABC algorithm
KW - Job-shop-type reprocessing job
KW - Remanufacturing systems
UR - http://www.scopus.com/inward/record.url?scp=85132809509&partnerID=8YFLogxK
U2 - 10.1007/s10845-022-01969-2
DO - 10.1007/s10845-022-01969-2
M3 - Article
AN - SCOPUS:85132809509
SN - 0956-5515
VL - 34
SP - 2963
EP - 2988
JO - Journal of Intelligent Manufacturing
JF - Journal of Intelligent Manufacturing
IS - 7
ER -