Simultaneous load scheduling of quay crane and yard crane in port container terminals

Der Horng Lee*, Zhi Cao, Jiang Hang Chen, Jin Xin Cao

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

4 Citations (Scopus)

Abstract

Load scheduling problems of the quay crane (QC) and yard crane (YC) are important issues in port container terminal operations. Because the two scheduling problems are closely related, this paper proposes a mathematical model to formulate the load scheduling problem of the QC and YC simultaneously. A genetic algorithm (GA) and a heuristic method [QC and YC scheduling heuristic (QYSH)] are designed for the problem solution. Results obtained through numerical experiments showed that the problem-oriented QYSH method significantly outperformed the GA and could be applied in real operations to conduct simultaneous quay crane and yard crane scheduling.

Original languageEnglish
Pages (from-to)62-69
Number of pages8
JournalTransportation Research Record
Issue number2097
DOIs
Publication statusPublished - 2009
Externally publishedYes

Cite this