Increasing flexibility of risk management in it projects with isorisk curves and risk mapping

G. Bubnov, B. Titarenko, S. Titov, R. Titarenko

Research output: Contribution to conferencePaperpeer-review

4 Citations (Scopus)

Abstract

The article deals with problem of prioritizing IT project risks. The widely used tool of risk prioritization is so called risk matrix which sometimes called also as probability and impact matrix. This matrix includes two dimensions-probability of risks and impact of risks on a project. In many situations the more flexible approach can be applied with the help of the risk maps that are describe in the text below. The risk maps seem to be especially useful for IT projects which are characterized by the big number of various risks and very dynamic environments.

Original languageEnglish
Publication statusPublished - 2015
Externally publishedYes
Event2015 5th International Workshop on Computer Science and Engineering: Information Processing and Control Engineering, WCSE 2015-IPCE - Moscow, Russian Federation
Duration: 15 Apr 201517 Apr 2015

Conference

Conference2015 5th International Workshop on Computer Science and Engineering: Information Processing and Control Engineering, WCSE 2015-IPCE
Country/TerritoryRussian Federation
CityMoscow
Period15/04/1517/04/15

Keywords

  • Isorisk curve
  • IT project risks
  • Risk management
  • Risk maps
  • Risk matrix
  • Risk prioritizing