Abstract
China’s electric vehicle (EV) closed-loop supply chain (CLSC) is increasingly exposed to dynamic instabilities arising from the interaction between demand-side shocks and production–inventory feedback structures. On the demand side, government subsidy phase-out and manufacturers’ promotion responses generate non-stationary, pulse-like demand patterns. On the system side, alternative remanufacturing and recycling configurations introduce additional recovery loops and delays, shaping the dynamics of players across echelons. This study develops a two-echelon EV CLSC system dynamics model by jointly considering subsidy phase-out and OEM promotion, and different recovery strategies. Based on industrial practice, three recovery strategies are considered: 1. The OEM outsources remanufacturing and recycling (RRO), 2, the OEM conducts in-house remanufacturing and outsources recycling (RIRO), and 3, the OEM conducts in-house remanufacturing and recycling (RIRI). Using a full-factorial design of experiments, we evaluate order and inventory dynamics for the OEM and the supplier under four key parameters, namely, subsidy phase-out speed, promotion intensity, proportional inventory correction speed, and recycling rate. Using the Integral of Time-weighted Absolute Error (ITAE), it indicates that RIRO generally achieves the lowest oscillations, whereas RIRI performs best when minimising ITAE, reflecting faster convergence at the expense of potential high peak amplification. Faster subsidy phase-out typically lowers ITAE by shortening the transition window, while promotion intensity exhibits a U-shaped effect for order and inventory ITAE: moderate promotion dampens instability but excessive promotion amplifies it. Furthermore, increasing inventory correction speed improves ITAE. These findings provide policy and managerial guidance on aligning subsidy withdrawal, marketing, and recovery design with dynamic performance objectives.
| Original language | English |
|---|---|
| Publication status | Published - Feb 2026 |
| Event | Twenty-Fourth International Working Seminar on Production Economics - Innsbruck, Austria Duration: 23 Feb 2026 → 27 Feb 2026 |
Conference
| Conference | Twenty-Fourth International Working Seminar on Production Economics |
|---|---|
| Country/Territory | Austria |
| City | Innsbruck |
| Period | 23/02/26 → 27/02/26 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 9 Industry, Innovation, and Infrastructure
Keywords
- EV closed loop supply chain
- subsidy phase-out
- in-house and outsourcing strategy
- system dynamics
- ITAE performance
Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver