Projects per year
Search results
-
Active
Numerical simulation and mechanism study of bridge pile-soil-fluid coupling under flooding
1/07/22 → 30/06/25
Project: Governmental Research Project
-
Not started
Three-dimensional simulation of wave-induced scour erosion around a cylinder
Project: Internal Research Project
-
Finished
Numerical Simulation and Mechanism Study on Bridge Collapse under Extreme Flood
Zhang, W., Liu, T. & Zhao, H.
1/10/21 → 30/09/23
Project: Governmental Research Project
-
Three-dimensional simulation of wave-induced scour erosion around a cylinder
1/03/21 → 28/02/24
Project: Internal Research Project